More Progress on the Side-Porch - Photos
The downspouts, the finishing coating on the concrete slab, railings, pairing, roof, steps are all done. All that is left now is to install the new french doors on the first floor and in dining room, as well as to add the hardware to the doors. Than its inspection time!